|
|
File / Folder Clean-Up Tool(Long Path) 1
Windows tool to delete files and folders with long and corrupted paths. Just browse to the file and press a button to detele it, thats it! The application solves the problem with inability to delete files and folders with long paths.
free download trial (142 Kb)
|
|
|
File / Folder Clean-Up Tool(Path too long) 1.1
Windows tool to delete files and folders with long and corrupted paths. Just browse to the file and press a button to detele it, thats it! The application solves the problem with inability to delete files and folders with long paths.
free download trial (172 Kb)
|
|
|
Trick or Treat 1.2.2
Take the shortcuts and play trick or treat with neighbors!
free download (256 Kb)
|
|
|
|
|
Path 3.01
Try to pass on a path. Before the beginning of game the game field is partially filled in with units. It is necessary, installing new units so that in any direction was no more than five units, to connect all units in the continuous road.
free download (483 Kb)
|
|
|
EASE Project Management Software 2.1
Project Management Software. CPM, schedule, labor, and materials. Schedule and Cost Work Breakdown Structure (WBS). Gantt charts include varying summary level. Labor use vs available task color coded histogram. Earned value (BCWS, BCWP,ACWP).
free download trial (397 Kb)
|
|
|
Gautama doing extremes ascetical 2.0
Buddha came to the world to show the path of righteousness, to destroy the path of error, and to break down sorrow.
free download (1.35 Mb)
|
|
|
|
|
FileList 2.3
FileList is a command line utility that produces a list of files of the given path in CSV format, which can be imported into a spreadsheet or database. The list includes the file name, size, path, last access and change date, etc.
free download (888 Kb)
|
|
|
Monkey Banana 1.1.0
Put the monkey in the proper place so that it can get the banana.
free download (341 Kb)
|
|
|
Netwrix User Activity Video Reporter 1.008.149
Netwrix User Activity Video Reporter records dynamic screen activity, providing necessary auditing visibility to critical systems and applications that don't provide logs and therefore are not accessible through traditional auditing solutions.
free download (32 Mb)
|
|
|
Cheewoo Part Simulator 2.0.1006.1017
Simulating and displaying CNC cutting path movement for checking it before real CNC cutting started. Supporting zoom-in, zoom-out, zoom-extent and NC block progress speed adjustment. Able to pause at any moment during simulation.
free download trial (2.62 Mb)
|
|
Pages : 1
| 2
| 3
| 4 | 5
|
|
|
|